新博多駅ビル
2010年09月11日
I passed in front of Hakata Station recently.
when I had a look at Hakata Station, I thought it was very huge.
New Hakata Station building is under construction now.
A newspaper says it will have been completed on March 3, 2011.
Kyushyu Shinkansen ( bullet train ) Kagoshima - root will have been opened
for traffic on March 12, 2011.
They say that the scale of it is about six times as large as that of now station.
It is a building with ten stories above ground and three beneath ground level.
The floor spaces of this building are two hundred thousand square meters.
Main tenants are Hankyu Department Store, Tokyu-hans,or the like.
Anyway, new Hakata Station is gigantic.
The growth of this area is amazing
I'm looking forward to the completion of new Hakata Station.
----------------------------------------------------------------------------------------------------
I read the article of The Press of Nishinihon on September 10th.
when I had a look at Hakata Station, I thought it was very huge.
New Hakata Station building is under construction now.
A newspaper says it will have been completed on March 3, 2011.
Kyushyu Shinkansen ( bullet train ) Kagoshima - root will have been opened
for traffic on March 12, 2011.
They say that the scale of it is about six times as large as that of now station.
It is a building with ten stories above ground and three beneath ground level.
The floor spaces of this building are two hundred thousand square meters.
Main tenants are Hankyu Department Store, Tokyu-hans,or the like.
Anyway, new Hakata Station is gigantic.
The growth of this area is amazing
I'm looking forward to the completion of new Hakata Station.
----------------------------------------------------------------------------------------------------
I read the article of The Press of Nishinihon on September 10th.
Posted by 福岡桃太郎 at 17:49│Comments(0)
│福岡徒然
上の画像に書かれている文字を入力して下さい
|
|
書き込まれた内容は公開され、ブログの持ち主だけが削除できます。